Building the ballast keel box
We've reached the point where we need to make up the ballast keel box.
The box is being built from 22mm mild steel, with stringers cut from 60mm plate. Each stringer needs drilling and tapping with 22mm holes. Once the box is assembled, we'll fill the voids inside with cement and lead.
Fixing the box to the hull
The box will be held to the boat with 18 mild steel studs, each wrapped in PTFE tape and lithium-based water pump grease to prevent seizing and corrosion.
Total ballast weight will come to 5,000 kilos.
Next: sheathing the hull
In the meantime, we're preparing the hull ready for a covering of bi-axial glass cloth and epoxy resin. Keep an eye out for updates on this next stage.